Mexico



Very usefull links



PW
Bookstore





News links

AP

AFP

Aljazeera

Dow Jones

Oil price

Reuters

Bloomberg

Views and News
from
Norway

 

 

 

 

 

PetroEcuador to tender new fuel, sulfur units at Esmeraldas refinery

 

 

By Reuters

NEW YORK
Petroleumworld 10 15 2018

Ecuador plans to issue a tender early next year to find a firm willing to build and operate two processing units at its state-run Esmeraldas refinery, an expansion that would reduce the need for imported fuel, according to a document seen by Reuters and the energy minister.

A prior $2 billion overhaul of the 110,000-barrel-per-day (bpd) refinery by the previous government of President Rafael Correa was insufficient to repair and modernize the Andean country's largest plant, forcing Petroecuador to plan new maintenance and upgrade projects.

“We have serious problems at Esmeraldas ... we are doing a great effort to maintain the refinery in operation,” Ecuador's minister of Energy and Natural Resources Carlos Perez told Reuters in an interview late on Thursday.

A $3 million maintenance program is expected to take about 60 days, starting in March. Esmeraldas' fluid catalytic cracker (FCC) and hydrodesulfurization unit, which are struggling to work properly, will be repaired, the minister said.

Following that program's completion, Ecuador's government would award two 20-year contracts to construct new sulfur and fuel processing units under a BOT (build–operate–transfer) model, according to Perez and the document, which details the proposals.

“We have received interest from companies willing to build the fuel unit,” Perez said. He did not disclose the names of the interested contractors.

Ecuador has total refining capacity of 175,000 bpd at three refineries. Most of them produce low octane, high sulfur fuels. The project aims to improve the quality and reduce emissions of diesel and gasoline produced at the Esmeraldas refinery.

Ecuador for a long time has planned a new refinery in Manabi, on the Pacific coast, but the company originally chosen to build it along with Petroecuador, Venezuela's financially strapped PDVSA, was unable to provide all the funds, causing delays.

Correa's government was in talks with Japan's Mitsubishi for building the fuel plant, but the parties did not reach an agreement. South Korea's SK Engineering and Construction and Australia's Worley Parsons in 2013 won contracts to upgrade and revamp some of Esmeraldas' processing units.

The new fuel unit is expected to require up to $1 billion in investment, and the sulfur plant would cost about $200,000, Perez said.

The tender will consider construction time, national content, experience building and operating similar projects and a fee to be paid by Petroecuador per barrel received, according to the document.

SPONSORED STORIES


________________________


Reporting by Alexandra Valencia and Marianna Parraga; editing by Grant McCool from Reuters.

reuters.com 12 11 2018


We invite all our readers to share with us
their views and comments about this article.
Write to editor@petroleumworld.com

By using this link, you agree to allow PW
to publish your comments on our letters page.

Any question or suggestions,
please write to: editor@petroleumworld.com

Best Viewed with IE 5.01+ Windows NT 4.0, '95,
'98,ME,XP, Vista, Windows 7,8,10 +/ 800x600 pixels

Twitter: @petroleumworld1


November 13 - 15, 2018.

Gubkin University, Moscow
SPE Student Chapter

 

 

 

 

 

 

 

TOP

Contact: editor@petroleumworld.com,

Editor & Publisher:Elio Ohep/
Contact Email: editor@petroleumworld.com

CopyRight © 1999-2016, Paul Ohep F. - All Rights Reserved. Legal Information

PW in Top 100 Energy Sites

CopyRight©1999-2017, Petroleumworld ™  / Elio Ohep - All rights reservedThis site is a public free site and it contains copyrighted material the use of which has not always been specifically authorized by the copyright owner.We are making such material available in our efforts to advance understanding of business, environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe this constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have chosen to view the included information for research, information, and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/107.shtml. If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission fromPetroleumworld or the copyright owner of the material.