World

 

Mexico

Bolivia

Peru

Trinidad &
Tobago

Venezuela








Very usefull links



Institutional
links



Venezuela
Central Bank
Economic Indicators



Venezuela Energy
& Mines
Ministry

 




OPEC





Petroleumworld
Business
Partners
:





 



 







Centre for
Global Energy
Studies



blogspots

caracas
chronicles


BOOK STORE


Petróleo Global
y
Estado Naciona
l



By Bernard Mommer
(Spanish only)

More info

Glossary of Petroleum
& Environment



English-Spanish/
Spanish-English


 


Petroleumworld`s
Opinion Forum:

viewpoints on issues in energy, geopolitics and civilization.

Sunday´s
Opinion

The Rush For Oil: Iraq’s Oil Capacity Potential And Regional Geopolitics


Iraqi Oil Forum

By Ruba Husari

Introduction

 

The year 2009 will go down in history as the year when Iraq opened again for business to Big Oil, just as 1975 was the year the door closed behind the last of the Iraq Petroleum Company (IPC) partners as they were pushed out in the wave of nationalizations of the 1970s.

 

It took six years since the change of regime and the lifting of UN sanctions for Baghdad to sign the first long term deals with western oil companies, and three of them so far (BP, ExxonMobil, Royal Dutch Shell) are former partners in the old IPC. China’s CNPC, which made an aggressive entry into Iraq, has already planted a foot by reviving and renegotiating last year the old Al-Ahdab oil field production sharing agreement signed in 1997.

 

The speed at which companies that participated and lost in the first ever bid round held in Baghdad on 30 June reversed their positions and accepted the Iraqi oil ministry’s stiff terms took many, including within Iraq, by surprise. As a result, instead of the modest success illustrated by a BP/CNPC service contract to redevelop the Rumaila field, two further contracts have now been awarded to a consortium of ExxonMobil and Shell to develop the West Qurna-1 field and to Eni with partners Occidental Petroleum and Kogas to develop the Zubair field. That is over 30bn barrels of reserves to be managed indirectly by foreign oil companies.

 

But as Baghdad celebrates the promised influx of tens of billions of dollars of foreign investment to developing resources that were for a long time hostage to wars and sanctions, many are becoming conscious of the more urgent need to closely monitor and plan Iraq’s return as a major oil producer and potentially the second largest world oil exporter, and its position within OPEC, which it helped create in Baghdad in 1960.

 

This paper looks at the different conditions as well as the schedules and timelines set up in the contracts awarded in recent weeks – plus those that could be awarded in the second bid round scheduled for 11 December 2009 – and the possible impact of the additional crude capacity on markets in the context of world supply and demand projections in the medium and long term. Beyond the technical aspect, the regional balance of power, Iraq’s bilateral relationships and its position within OPEC are equally set to be affected by Baghdad’s potential new role as the second largest oil producer in the region, and longer term, in the world. All this is provided the many domestic and external risks do not interfere to derail this huge enterprise. 

 

Beyond the contracts for the three producing fields, where plans would see output there increase from the current 1.5mn b/d to 1.65mn b/d within a couple of years and to a staggering 6mn b/d within six years, the exact capacity additions from the second licensing round fields will not be known until bids are made next month. The calculations of the term incremental capacities assume that five of the 10 contract areas offered in the next round would be awarded to foreign companies after excluding those associated with higher risk due to their geographical location or size of reserves. The five “most attractive” used for the analysis of long term capacity potential are the two giants Majnoun and West Qurna-2, as well as Halfaya, Gharraf and East Baghdad, all previously sought or studied by international oil companies.

 

 

The Chosen Trio: Rumaila, Zubair and West Qurna

 

The contracts awarded for producing fields offered in the first bid round stipulate a rehabilitation phase of three years starting from the effective date of the contract and ending 36 months after the approval date of the rehabilitation plan. The rehabilitation plan itself should be submitted for approval within six months from the effective date.


 The rehabilitation plan consists of a remedial program that is meant to deal with the problems suffered by the fields over the long years of sanctions and wars and of an appraisal program for producing as well as non-developed reservoirs. The remedial program involves three steps starting with a halt to any non-optimal operations in the oil fields that Iraqi oil engineers had to revert to in past years, often due to the lack of other options; then arresting the production decline in the oil fields, especially at Rumaila where it currently averages 5-10%; and finally achieving a sustainable and improved production rate of 10% above the initial rate prevailing at the start of the contract. 


According to the agreements, the improved production target rate should be achieved as soon as possible after the approval of the rehabilitation plan. And since foreign companies will only recover costs once this initial incremental production is brought on stream, it is expected that they will seek to realize it in the shortest delays, probably in the first year of the contract. For the three fields in question, it means about 150,000 b/d could be added within a year.

 

 

First Round Oil Projects

 

 

Rumaila

Zubair

West Qurna-1

Total

Reserves (Bn Barrels)

17.767

4.080

8.584

30.43

Initial Production Rate (Mn b/d)

1.050

0.195

0.260

1.50

Improved Production Rate (Mn b/d)

1.155

0.214

0.286

1.655

Target Plateau (Mn b/d)

2.85

1.125

2.325

6.3

 

Source: Ministry of Oil Data.

 

During the three-year rehabilitation period, and with the intensive capital investment required and the improved reservoir management brought in by the foreign companies, output from the three fields should gradually start building up as new facilities are installed. By the time the rehabilitation phase ends, output is expected to be up by at least 30% as they embark on an enhanced redevelopment plan. That implies a production average from the three fields of some 1.97mn b/d in early 2013 from just over 1.5mn b/d currently being produced.

 

Timeline Of A Producing Field Technical Service Contract*

The next milestone following the rehabilitation period is the achievement of the plateau production target consisting of crude and natural gas liquids (NGLs), as bid by the consortium which won the field technical service contract. According to the terms of the contract that target – collectively in excess of 6mn b/d for the three fields – should be achieved no later than six years from the effective date and should be maintained during the seven years of the plateau production period. The plateau production period starts once the plateau production target, which shall include production from producing reservoirs only, has been achieved for a continuous period of 30 days.

 The Green Fields


The Development and Production Service Contract (DPSC) used for the development of the green fields in the second bid round involves major differences from the oil field “redevelopment” contract used for the award of Rumaila, Zubair and West Qurna-1. The most important difference is the absence of an initial production rate. As such, and despite minor production in some of the fields (Majnoun is currently producing 60,000 b/d, Halfaya is producing 3,000 b/d, and East Baghdad 10,000 b/d) the winning consortium is expected to carry out appraisal, development and production as well as exploration within the field area awarded, all under the same contract.


The first task defined by the contract is the submission of a preliminary development plan, defining targets and phases for the development of the known reservoirs in the field in question, as well as plans for further exploration and appraisal work, within six months from the effective date. The final development plan should be submitted no later than three years from the effective date.

 

The first milestone is the completion of the minimum work within three years of the approval of the preliminary development plan. The minimum work program includes a combination of exploration and appraisal drilling, and subsurface work such as reservoir characterization and dynamic modeling, including 3D seismic acquisition.  


With a contractual obligation that in-field work should start within six months of the approval of the preliminary development plan, it is fair to assume that first commercial production from the new fields would start within some 18-24 months from the signing of the contracts. Companies have an interest in starting early production as soon as possible to generate the first cash flow from cost recovery once commercial production comes on stream.

 

Timeline Of A Development And Production Service Contract *

The second milestone is the achievement of the production plateau target within seven years from the effective date. This production target, being a biddable parameter, is expected to be high compared to what previous ministry studies have been targeting for each of the fields offered in the second bid round. To avoid exaggerated production plateau targets, the oil ministry decided to alter the scoring formula by giving more weight to the remuneration fee rather than the production plateau target, as was the case in the first bid round. 

 

Still, if the production plateau bids in the first licensing round are anything to go by, the bidding companies are expected to aim high this time too, to guarantee a foothold in the country, since no more fields are likely to be offered for development by foreign companies for a long time to come.  

 

In the first bid round, the 2.85mn b/d production plateau target bid by BP/CNPC for the Rumaila field was 60% higher than the minimum production plateau target of 1.75mn b/d designated by the ministry. Eni and partners Occidental Petroleum and Kogas bid almost three times (1.125mn b/d) the ministry’s minimum production plateau bid of 400,000 b/d. ExxonMobil together with Shell bid 2.325mn b/d for West Qurna-1, or more than three times the ministry’s minimum of 600,000 b/d.  

 

Both Majnoun and West-Qurna-2 are giants in the same league as West Qurna-1 in terms of reserves size. West Qurna-2 is in reality the northern half of the super giant West Qurna field, West Qurna-1 being the southern half. While the super giant Rumaila field – which is also split into two giants, the North Rumaila and South Rumaila – which started production several decades ago and has been going at an output rate of more than 1mn b/d for long years, the three other fields are yet to achieve their potential in comparison. West Qurna-1 in fact only started production less than a decade ago.  

 

Old oil ministry studies have used modest average production indications for those fields when it first offered them to international oil companies in the 1990s. For example, Majnoun’s target was put at 600,000 b/d when Total negotiated a production sharing agreement (PSA) for the field in 1998 but stopped short of signing it due to international sanctions imposed on Iraq at the time. Lukoil’s PSA for West Qurna-2 (signed in 1997 and later annulled by Iraq in 2002) targeted a similar peak output.  

 

During negotiations with international oil companies in the 1990s Halfaya’s average production target was put at 250,000 b/d, Gharraf’s at 120,000 b/d and East Baghdad which has not been fully appraised in the past and is considered geologically challenging to develop, at between 120,000 b/d and 160,000 b/d.

 

Selected Second Round Oil Projects (‘000 b/d)

 

 

 

Commercial Production

Plateau Period (Years)

Average Production Indications*

Reserves

(Bn Barrels)

Majnoun

175

10

600

12,580

West Qurna-2

120

13

560

12,876

East Baghdad

30

10

120-160

8,108

Halfaya

70

13

250

4,098

Gharraf

35

13

120

0.863

 

Source: Ministry of Oil Data.


*Average Production Indications as given by an oil ministry official at a presentation in Baghdad in February 2009.

 

Production Capacity Boom

 

The three contracts awarded for the fields tendered in the first licensing round will become effective successively during the month of November. Provided the second licensing round concludes as smoothly as expected, with lessons from the first one learnt, the second group of contracts are set to be ratified by the council of ministers by January at the latest.

 

Based on the timelines specified by the two types of contracts, it is reasonable to assume that the first production increments would come from the improved production rates in the producing field and the first commercial production in the green fields in 2011 and considerable capacity additions would be achieved by 2013. However, by 2016 and 2017 all fields will be hitting their production plateau target. The three producing fields awarded under the first bid round (Rumaila, Zubair and West Qurna-1) will collectively be producing more than 6mn b/d.

 

Iraqi Minister of Oil Husain al-Shahristani estimated at a press conference held in Baghdad on 13 October that the 10 contract areas on offer in the second bid round would have a production ceiling of 4-5mn b/d. Based on these assumptions and taking into consideration the size of the reserves of the five “most attractive” fields, it appears quite acceptable to assume a collective production plateau of just over 3mn b/d from this group of five fields.  

 

The table assumes that both Majnoun and West Qurna-2 fields receive production plateau bids in the range of 1.2-1.25mn b/d, and Halfaya a plateau bid of around 450,000 b/d, or about double the old oil ministry estimates for the three fields, and about 80% above old ministry estimates for the small Gharraf and East Baghdad.

 

Current output from the main remaining fields in the north (Kirkuk, Bai Hasan, Jambur) and the south (Misan, Nour, ) is about 900,000 b/d of which 100,000 b/d is produced in Misan, 75,000 b/d from Majnoun and the rest (700,000 b/d) from the northern fields. By 2016, one can assume that output from Kirkuk will continue to decline by 5% per year but could be compensated by an increase in output from Bai Hasan. Nassiriya currently at 20,000 b/d will be producing 150,000-200,000 b/d by 2012 if an engineering, procurement and construction contract currently being negotiated with Japan’s Nippon is awarded this year.

 

Production Capacity Estimates According To Contracts Timelines (Mn B/D)


 

 

 

Plateau Target Date

End of Plateau Periods

 

2011

2013*

2016-2017**

2023

2027

2030

Rumaila

1.155

1.365

2.85

2.85

 

 

Zubair

0.214

0.253

1.125

1.125

 

 

WQ-1

0.286

0.338

2.325

2.325

 

 

Total

1.655

1.956

6.3

6.3

 

 

Majnoun

0.175

0.36

1.2

1.2

1.2

 

WQ-2

0.12

0.375

1.25

1.25

 

1.25

Halfaya

0.07

0.135

0.45

0.45

 

0.45

Gharraf

0.035

0.067

0.225

0.225

 

0.225

East Baghdad

0.03

0.067

0.225

0.225

0.225

 

Total

0.430

1.004

3.35

3.35

 

 

Other Fields

0.8

0.8

1.0

1.0

 

 

KRG fields

0.5

1.0

1.0

1.0

 

 

Total

3.385

4.76

11.65

11.65

 

 


*2013 estimates based on an increase of 30% of the initial production in the producing fields and a similar percentage of the target plateau in the non-producing fields.


** Production Plateau Targets for 2nd licensing round fields are assumptions.

 

 

For the sake of the illustrations, we assume – conservatively – that oil production capacity maintained by national effort remains around 900,000 b/d by 2013 and increases to 1mn b/d by 2016. Kurdistan Regional Government (KRG) fields’ output could contribute up to 1mn b/d in the medium term, though sustaining a stable output from the KRG fields is contingent on reaching an agreement between Irbil and Baghdad on all pending issues. Once the production plateau targets are achieved by 2016 for the first group of fields and 2017 for the second, they are to be maintained at least until 2023 for the group of the three producing fields and to between 10 and 13 years for the others, which means up to 2030 for some.

The Dilemma For OPEC


The expected rapid developments in the Iraqi oil sector and the accelerated build up of output capacity over the next decade and beyond – provided they are not interrupted by internal or external threats – pose two major challenges for OPEC. One is related to the organization’s ability to maintain supply at a level that insures oil prices remain within the range that guarantees adequate revenues to its member countries and the other concerns the cohesion within the producers’ club as members – or some of them – compete for higher production quotas.

 

After the drop in demand for OPEC crude in 2009 due to the global economic contraction, the organization’s number crunchers expect it to rise again over the medium term until it returns back to the 2008 levels by 2011. However by that time Iraq could add about 1mn b/d to its current production of 2.4mn b/d, while world demand would have increased by just 2.3mn b/d and supply would be already outstripping demand by 300,000 b/d.

 

By 2013, OPEC expects crude oil spare capacity, excluding that of Iraq, to rise to 6mn b/d. If spare capacity rises too high, it might induce downward pressure on prices, especially taking into consideration the impact of the recent recession, the organization warned in its World Oil Outlook released last summer. Based on the previous assumptions, Iraq could be adding some 2mn b/d on its own by 2013 as it targets an output capacity of 4.7mn b/d. If the 11.5mn b/d capacity targeted is realized according to schedule by 2016-17, OPEC – and Iraq – will be facing a real dilemma.  

 

After 2013, the amount of OPEC crude required is projected to continue to rise to just over 41mn b/d by 2030. That is 2.5mn b/d less than what it was in 2008. The share of OPEC crude in total supply by 2030 is just 39%, according to forecasts based on OPEC’s reference case scenario. “The key issue is therefore not related to availability of crude but to deliverability and sustainability,” OPEC concludes.

 

OPEC Medium And Long Term Outlook 1  (Mn B/D)

 

 

2008

2009

2010

2011

2012

2013

2015

2020

2025

Oil Supply Outlook

85.8

83.1

84.7

85.8

87.0

88.2

90.5

95.7

100.7

Oil Demand Outlook

85.6

84.2

84.6

85.6

86.7

87.9

90.2

95.4

100.4

 

Long Term Supply And Demand Comparative Projections 2  (Mn B/D)

 

 

2015

2030

 

OPEC

IEA

EIA

OPEC

IEA

EIA

World Oil Supply Projections

 

 

 

 

 

 

Non-OPEC

52.4

49.9

52.5

56.3

 53.5

62.8

OPEC

38.1

44.4

38.1

49.6

 52.9

43.8

Total

90.5

94.3

90.6

105.9

 106.4

105.6

World Oil Demand Projections

90.2

94.4

90.6

105.6

106.4

106.6

 

The last time Iraq had a quota assigned was on the eve of the invasion of Kuwait in July 1990. At the time, it was set at 3.14mn b/d or some 14.5% of OPEC’s total compared to a production capacity of 3.5mn b/d. Baghdad could indeed attain that output capacity again by 2011, based on the scenario above.

 

 To accommodate Iraq’s projected 3.4mn b/d within the next two years, and a further 1.3mn b/d less than two years later is a tall order for OPEC in view of its own forecast of the call on its members’ crude and its estimates of the 6mn b/d spare capacity that will be sitting idle at a time when Iraq would be pumping at full throttle six-to-seven years from now. As it appears today, Iraq will then be sitting on redundant capacity.

 

 Judging by previous reactions when Iraq had the potential to restart exports back in 1996, when it agreed the oil-for-food program with the UN, and again in 2003 when the sanctions were lifted and Baghdad was allowed to export at will, the issue is expected to be divisive within the producers’ organization.

 

 When it was assumed in 1996 that Iraq could be allowed to sell unlimited amounts of crude to buy food, disagreement over who should make room for Iraqi exports gave early signs of the war of quotas that was about to start. Iran for one was uncompromising when it made clear that if OPEC had to cut output to make room for Iraq, Saudi Arabia (and to a lesser extent the UAE) should bear the main brunt of any cutback required since it was the main beneficiary of the 1991 Gulf crisis.

 

 “The whole intra-OPEC nexus of conflicting interests, entrenched positions and mutual distrust is indeed highly intractable. But the real tragedy will be if an effective path towards a solution cannot be found except through a price collapse,” warned former MEES Editor-In-Chief Ian Seymour then. 3 

 

 The Iranian argument was based on the fact that Riyadh, which was producing 5mn b/d in 1989 and had stepped in to replace Iraqi and Kuwaiti output when both disappeared from the market in 1991, had since increased its output by 60% above pre-war production at over 8mn b/d.

 

However, it was the restrictions which were eventually imposed on Iraqi exports at the time which saved the organization from having to face up to the inevitable.

 

The specter of Iraq’s aggressive return to the market in 2003 and the lifting of UN sanctions following the US-led war that toppled the Ba'ath regime again threatened the cohesion within OPEC as members debated how to digest Iraq’s anticipated extra production. Yet again, OPEC was saved from that moment of truth as Iraq plunged into years of internal strife and instability and the promised comeback was delayed by several years as its oil sector struggled to get back on its feet.

 

 So, what are the choices as that moment of truth seems to be drawing nearer – again – provided contracts signed are executed according to the agreed timeline?

 

Concerned over security of demand, as much of the extra capacity thought in 2007 and early 2008 to be needed, turns out to be unwarranted for, at least partially, as OPEC notes in its 2009 report, many producers have already revised their upstream investment plans for the coming few years and shelved projects where work had not started. A new contingency plan and possibly a further revision of projects to be executed could later be dictated by the potential extra Iraqi capacity.

 

 Iraqi oil officials for their part maintain that they will not go it alone and will preserve the interest of the organization they helped found in 1960. Without coordinating its act with OPEC, Iraq is set loose from dumping its oil on the market and drawing oil prices to a plunge at a time it is in dire need of all the revenue it could put its hand on.

 

“Iraq is going to follow a well balanced strategy satisfying the national interest on one hand and working for stable and fair price by coordinating with OPEC members on the other. The build up of our capacity will be gradual and shall take many years to reach high levels. We will not look at it from volume or capacity point of view only but shall also take cost to us and revenue into consideration,” points out Thamir al-Ghadhban, former oil minister and chief advisor to the Iraqi prime minister, when asked about possible tension with OPEC members over Iraq’s planned aggressive output capacity push in the next few years. “Such a high production capacity would cost the country a lot in adding facilities since capital expenditure is repaid back to the foreign companies. In return, the revenue of the state will be dependent on the price of the barrel and therefore we have to assess the effect of such a large surplus capacity on the oil prices on the market.” 4

 

The last time Iraq had a quota assigned was on the eve of the invasion of Kuwait in July 1990. At the time, it was set at 3.14mn b/d or some 14.5% of OPEC’s total compared to a production capacity of 3.5mn b/d. Baghdad could indeed attain that output capacity again by 2011, based on the scenario above.

 

To accommodate Iraq’s projected 3.4mn b/d within the next two years, and a further 1.3mn b/d less than two years later is a tall order for OPEC in view of its own forecast of the call on its members’ crude and its estimates of the 6mn b/d spare capacity that will be sitting idle at a time when Iraq would be pumping at full throttle six-to-seven years from now. As it appears today, Iraq will then be sitting on redundant capacity.

 

Judging by previous reactions when Iraq had the potential to restart exports back in 1996, when it agreed the oil-for-food program with the UN, and again in 2003 when the sanctions were lifted and Baghdad was allowed to export at will, the issue is expected to be divisive within the producers’ organization.

 

When it was assumed in 1996 that Iraq could be allowed to sell unlimited amounts of crude to buy food, disagreement over who should make room for Iraqi exports gave early signs of the war of quotas that was about to start. Iran for one was uncompromising when it made clear that if OPEC had to cut output to make room for Iraq, Saudi Arabia (and to a lesser extent the UAE) should bear the main brunt of any cutback required since it was the main beneficiary of the 1991 Gulf crisis.

 

“The whole intra-OPEC nexus of conflicting interests, entrenched positions and mutual distrust is indeed highly intractable. But the real tragedy will be if an effective path towards a solution cannot be found except through a price collapse,” warned former MEES Editor-In-Chief Ian Seymour then. 3 

 

The Iranian argument was based on the fact that Riyadh, which was producing 5mn b/d in 1989 and had stepped in to replace Iraqi and Kuwaiti output when both disappeared from the market in 1991, had since increased its output by 60% above pre-war production at over 8mn b/d.

 

However, it was the restrictions which were eventually imposed on Iraqi exports at the time which saved the organization from having to face up to the inevitable.

 

The specter of Iraq’s aggressive return to the market in 2003 and the lifting of UN sanctions following the US-led war that toppled the Ba'ath regime again threatened the cohesion within OPEC as members debated how to digest Iraq’s anticipated extra production. Yet again, OPEC was saved from that moment of truth as Iraq plunged into years of internal strife and instability and the promised comeback was delayed by several years as its oil sector struggled to get back on its feet.

 

So, what are the choices as that moment of truth seems to be drawing nearer – again – provided contracts signed are executed according to the agreed timeline?

 

Concerned over security of demand, as much of the extra capacity thought in 2007 and early 2008 to be needed, turns out to be unwarranted for, at least partially, as OPEC notes in its 2009 report, many producers have already revised their upstream investment plans for the coming few years and shelved projects where work had not started. A new contingency plan and possibly a further revision of projects to be executed could later be dictated by the potential extra Iraqi capacity.

 

Iraqi oil officials for their part maintain that they will not go it alone and will preserve the interest of the organization they helped found in 1960. Without coordinating its act with OPEC, Iraq is set loose from dumping its oil on the market and drawing oil prices to a plunge at a time it is in dire need of all the revenue it could put its hand on.

 

“Iraq is going to follow a well balanced strategy satisfying the national interest on one hand and working for stable and fair price by coordinating with OPEC members on the other. The build up of our capacity will be gradual and shall take many years to reach high levels. We will not look at it from volume or capacity point of view only but shall also take cost to us and revenue into consideration,” points out Thamir al-Ghadhban, former oil minister and chief advisor to the Iraqi prime minister, when asked about possible tension with OPEC members over Iraq’s planned aggressive output capacity push in the next few years. “Such a high production capacity would cost the country a lot in adding facilities since capital expenditure is repaid back to the foreign companies. In return, the revenue of the state will be dependent on the price of the barrel and therefore we have to assess the effect of such a large surplus capacity on the oil prices on the market.” 4

 

Notes:


1.
OPEC, World Oil Outlook 2009. Tables reproduce reference case scenarios only. For an overview and main assumptions of the reference case see www.opec.org


2.
OPEC, World Oil Outlook 2009.

 

3. ‘Can OPEC Handle A Resumption of Iraqi Oil Exports?’, MEES, 12 February 1996.

 

4. Private correspondence, 4 November 2009.

 

5. Private correspondence


6.
Ibid.

 

* Timeline Of A Producing Field Technical Service Contract and Timeline Of A Development And Production Service Contract can be seen at the original publication

 

Ruba Husari is an expert on Middle East energy and editor of Iraq Oil Forum , a specialized website on Iraq’s oil industry and politics. She is based in Baghdad.Petroleumworld not necessarily share these views.

 

Editor's note:This article was first posted Middle East Economic Survey ( MEES), VOL. LII, No 45, 9-Nov-2009. Petroleumworld reprint this article in the interest of our readers. All comments posted and published on Petroleumworld, do not reflect either for or against the opinion expressed in the comment as an endorsement of Petroleumworld.
All comments expressed are private comments and do not necessary reflect the view
of this website. All comments are posted and published without liability to Petroleumworld.

Fair use Notice: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of issues of environmental and humanitarian significance. We believe this constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107. For more information go to:
http://www.law.cornell.edu/uscode/17/107.shtml.

All works published by Petroleumworld are in accordance with Title 17 U.S.C. Section 107, this material is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. Petroleumworld has no affiliation whatsoever with the originator of this article nor is Petroleumworld endorsed or sponsored by the originator.

Petroleumworld encourages persons to reproduce, reprint, or broadcast
Petroleumworld articles provided that any such reproduction identify the original source, http://www.petroleumworld.com or else and it is done within the fair use as provided for in section 107 of the US Copyright Law.

If you wish to use copyrighted material from this site for purposes of your own that
go beyond 'fair use', you must obtain permission from the copyright owner.
Internet web links to http://www.petroleumworld.com are appreciated

Petroleumworld welcomes your feedback and comments: editor@petroleumworld.com.

By using this link, you agree to allow PW to publish your comments on our letters
page.


Petroleumworld News 11/25/ 09
Copyright© 2008 respective author or news agency. All rights reserved.

We welcome the use of Petroleumworld™ stories by anyone provided it mentions Petroleumworld.com as the source. Other stories you have to get authorization by its authors.

Send this story to a friend

Your feedback is important to us!


We invite all our readers to share with us
their views and comments about this article.

Any question or suggestions, please write to editor@petroleumworld.com



Best Viewed with IE 5.01+
Windows NT 4.0, '95, '98 and ME +/ 800x600 pixels

 

Contact:editor@petroleumworld.com/phones:(58 412) 996 3730 or 952 5301

www.petroleumworld.com-Editor:Elio Ohep /
Publisher-Producer:Elio Ohep.

Contact Email:
editor@petroleumworld.com

Legal
Information. CopyRight © 1999-2006, Elio Ohep.- All rights reserved

Fair use notice of copyrighted material:
This site is a public free site and it contains copyrighted material the use of which has not always been specifically authorized by the copyright owner.We are making such material available in our efforts to advance understanding of business, environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe this constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have chosen to view the included information for research, information, and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/107.shtml.

If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission fromPetroleumworld or the copyright owner of the material.